BULK DRUG MFG. FACILITY
- TOTAL AREA OF SITE : 4071 M2
- BULK DRUG MFG UNITS : 2 Nos
- R M WAREHOUSE
- FINISH GOODS STORE
- QC LAB with HPLC & GC Facility
- UTILITY BLOCK
- ETP : 25KLPD CAP.
- SOLVENT YARD
- SOLVENT RECOVERY SYSTEMS
- FIRE HYDRANT SYSTEM
DETAIL API MFG. PLANT
- PLANT DESIGN : AS PER GMP GUIDELINE
- PLANT-1 SIZE & AREA : 42mtr X 22mtr : 924 M2
- PLANT-2 SIZE & AREA : 20mtr X 7mtr : 140 M2
- REACTOR CAPACITY IN INTERMEDIATE AREA : 22 Nos.
- REACTOR INSTALLAED IN INTERMEDIATE AREA : 15 Nos.(TOTAL 72KL)
- MSGL REACTOR : 3 Nos. – 3KL, 6.3KL & 8 KL CAPACITY
- SS REACTORS : 12 Nos – 0.05KL,2 KL, 3 KL ,5 KL (2 Nos.) 6 KL(2 Nos), 8 KL (2 Nos.) CAPACITY
- HYDROGENATION FACILITY WITH PRS STATION SEMI AUTOMATIC CONTROLLED BY SCADA: 2 Nos -4 KL & 7 KL WORKING CAPACITY
- FILTERATION EQUIPMENT: SS SPARKLER(02 NO),SS CANDLE FILTER (02 Nos.),HDPE NUTCH FILTER(01 No.),
- SS BAG FILTER : (02Nos)
- SS CENTRIFUGE (HALAR COATED) : 02 Nos(48”)
- DRYING EQUIPMENT : RCVD HALAR COATED-03KL CAPACITY.-01 No.
- MULTIMILL : 01 No.
- SHIFTER : 01 No.
- SS FLAKER : 01 Nos
- HVD COLUMN : 300MM DIAX7.5 MTR :01 NO : 800MMDIAX7.5MTR : 01 NO
UTILITIES
- CHILLED WATER CAP : 50 TR @ 5Deg C
- BRINE WATER CAP : 25 TR @ (-) 20 DegC
- COOLING WATER : 250 TR
- STEAM BOILER CAP : 1.0TPH
- HOT OIL SYSTEM : 2 LAKH KCAL
- PURIFIED WATER CAP : 96 KLPD
- GAS SCRUBBING SYSTEM : 04 Nos.
- HOT WATER SYSTEM : 02 Nos
- VACUUM SYSTEMS : 05 Nos. (WATERING)-650MMHG
- : 01 No.(STEAM JET EJECTOR-3 STAGE)759.5MMHG
- COMPRESSED AIR : 75CFM
- NITROGEN SYSTEM : (20 Nm^3 per hr)
COMMON FACILITIES
- R.M. WAREHOUSE
- FINISH GOODS STORE
- PILOT PLANT
- PRODUCTION AREA
- QUALITY CONTROL
- QUALITY ASSURANCE
- STP PLANT
- ETP (FOR PRIMARY TREATMENT)
- UTILITY BLOCK
- SOLVENT YARD
- SOLVENT RECOVERY SYSTEM
- FIRE HYDRANT SYSTEM
- EHS
- ADMIN AND HR BLOCK
- PRODUCTION AND ENGINEERING OFFICIES
- DG SET-250KVA
TYPE OF REACTION FACILTY
- HYDROGENATION
- CYANATION
- CHLORINATION
- REDUCTION
- OXYDATION
- NITRATION
- HYDROLYSIS
- DISTILLATION(HVD)
- AND MANY MORE